Ground system

The ground system at WP3XEN. Four pieces of copper strap connected the tower base to the ground ring and several ground rods. In keeping with standard broadcast practice, 120 copper ground radials were run from the ground ring. Since this was a temporary installation, the radials were laid on the ground, rather than being buried. All of them were removed when the station was dismantled on July 16, 2003.

Back